// Fire Safety Projects in Perth, WA

// Siskas, North Fremantle

The final stage of development at Gary Dempsey’s Taskers complex in North Fremantle. The fifty-five river view apartments represent the pinnacle of luxury living in WA.

Due to our outstanding delivery on the previous Tekona apartment building on the same complex, Mechanical Fire Solutions were invited back to aid completion of the project. The contract includes;

  • Design and installation of a twin level fire sprinkler system
  • New alarm valve and trim
  • Connection to existing fire pump set

// Dampier Port Accomodation Village, Dampier WA

Through an ongoing relationship, Mechanical Fire Solutions has been engaged to look after the fire sprinkler remedial works on this 500+ room reactivation project on the north west coast of WA.

Our expertise in completion of regional projects, combined with our experience in working to the stringent safety requirements of resource companies, is enabling us to deliver the best product available.

// 40 the Esplanade, Perth CBD

As the fire sprinkler services provider, Mechanical Fire Solutions carries out a variety of duties at this location, including, but not limited to;

  • Periodic inspections and testing
  • Fire system maintenance and repairs
  • Making safe of systems for ceiling removal
  • High spec base build design and installation, including production of drawings for mechanical and electrical positioning, in preparation for new tenant acquisition
  • Fitouts to suit new tenants design

// Aegis Shorehaven, Alkimos

Aegis Shorehaven will permit residents to enjoy a host of well-appointed amenities including an in-house cinema, beauty salon, hydrotherapy spa, library, café, alfresco courtyard dining.

Mechanical Fire Solutions were engaged alongside industry leading builder PS Structures to complete this project to an exceptional standard.

MFS carried out the design and installation of three fire sprinkler systems to this new 134 bed, $25 million aged care facility in Perths northern suburbs.

// National Storage, East Perth

Full redevelopment and transformation of a 5 level data centre into a state of the art storage facility.

Mechanical Fire Solutions were engaged by an ongoing client to design and construct a new complete package system for the site, this included;

  • Relocation of the existing Alarm Valve set
  • Installation of fire sprinklers to 3 levels
  • Supply and install of new fire hydrant pump and tanks
  • Relocation of the existing booster cabinet assembly
  • Modification and reprogramming of the existing detection system
  • Installation of a building occupant warning system

// Epiroc Office and Warehouse, Perth Airport

Mechanical Fire Solutions has completed the fire sprinkler services contract at Epiroc’s new 5000m2 warehousing facility, located at the Perth Airport.

The contract included installation of an Early Suppression Fast Respone sprinkler system, Twin Diesel Fire Pumps, and a 480,000 litre Water Storage Tank.

// Geodis Office and Warehouse, Perth Airport

Mechanical Fire Solutions has completed the fire sprinkler services contract at Geodis’s new 2500m2 warehousing facility, located at the Perth Airport. The contract included installation of an Early Suppression Fast Respone sprinkler system, Twin Diesel Fire Pumps, and a 380,000 litre Water Storage Tank.

// St Vincent’s Aged Care Facility, Guildford

Mechanical Fire Solutions has been completed the fire sprinkler services contract for St Vincent’s new multi-level, $28 million residential care facility, consisting of 81 beds, located on the banks of the Swan river in Guildford.

// Parmelia House

Mechanical Fire Solutions have been engaged to provide a multistage firesprinkler system upgrade for this commercial building consisting of:

  • Rerouting of water supply and boost lines to accommodate a new site fire sprinkler and hydrant booster
  • Installation of a new sprinkler system to the mezzanine floor plant room and offices
  • Installation of a new sprinkler system to level 19 plant room
  • Installation of a new sprinkler system to the roof level plant area
  • Tail end pre-action system to the roof level lift motor room

// Resource Recovery Facility, Bibra Lake

Mechanical Fire Solutions were engaged by the owners to extend the facilities fire sprinkler and occupant warning system to include an 800sqm extension of their recycling shed, and a 900 Sqm covered area.

The challenge for this operational facility was minimising the impact to its 7 day per week operation.

Applying a systematic approach throughout the planning stage Mechanical Fire Solutions were able to manufacture all equipment offsite allowing for a staged installation over multiple weekends, minimising disruption to the facility.

// National Storage Facility North Fremantle

Located in the heart of Fremantle, this facility comprises of four individual, multi-level buildings containing over 9,000 sqm of self storage, as well as the head contractors new regional offices.

Mechanical Fire Solutions are supplying a complete package option including.

  • fire sprinkler system
  • fire pump
  • fire water storage tank
  • integrated occupant warning system
  • fire extinguishers

// Stirling Central Redevelopment – Stage 2

Mechanical Fire Solutions were awarded a design and construct sprinkler contract for stage 2 of the multimillion-dollar Stirling Shopping Centre redevelopment.

The fire sprinkler works consisted of modifications to the north mall to suit new feature ceilings, as well as the fitout of a 1000sqm tenancy, complete with new control valve.

// Byford Retail Development

Mechanical Fire Solutions were contracted by Spyda construction to install fire protection equipment at the new Woolworths retail development, servicing the rapidly expanding suburb of byford WA.

Mechanical Fire Solutions package contained the supply and installation of the following;

  • Fire Sprinkler Protection to an area of over 4000m²
  • Electric Duty and Diesel Stand-by Automatic Fire pumps and trim
  • Twin 50,000l fire water storage tanks
  • Combined brigade booster and suction cabinet including Bushfire cam-lock to suit DFES regulations
  • Protection to high temperature food grade cooking hoods and associated ductwork
  • Dry pendant freezer drop for sub-zero applications
  • Portable fire equipment

// Keepsafe Storage Welshpool WA

Mechanical Fire Solutions installed a complete package fire system for this state-of-the-art self storage facility. Working closely with all stakeholders; under strict time constraints and within budget , Mechanical Fire Solutions were able to provide a turnkey solution representing both outstanding quality and value, for this projects’ fire protection needs including:

  • Automatic Fire Sprinkler System
  • Hydrant & Hose Reel System
  • Occupant Warning System
  • Fire Pumps
  • Fire Extinguishers

// Bethanie On The Park Menora WA

Completed on time and on budget Mechanical Fire Solutions installed a residential fire sprinkler system over two interconnected four story buildings. Close collaboration with the builder and other service providers ensured successful integration and handover of the full fire protection system.

// Tekona Apartments North Fremantle WA

Mechanical Fire Solutions were awarded the Fire Sprinkler System Design & Construct contract for this prestigious apartment development.

With our experienced installation team working closely with our design team, this project represented a key example of our companies ability to deliver a high end service at affordable rates.

// Royal Perth Hospital A Block Fire Services Upgrade Perth WA

Mechanical Fire Solutions were contracted to install Sprinklers and Hydrants as part of a multi-stage fire protection upgrade to selected areas of Royal Perth Hospitals’ A Block. Mechanical Fire Solutions work package was completed over 8 stages with progressive hand overs. Strong collaboration between Mechanical Fire Solutions and the head contractor, coupled with a proactive hands-on approach to managing this project from design through to commissioning ensured all stages were completed and handed over on time and on budget, with minimal impact to the Hospitals operation.

// Tribeca East Apartments Rivervale WA

Mechanical Fire Solutions were successful in their bid for the Fire Sprinkler & Hydrant system installation for this six story apartment building. From the outset, Mechanical Fire Solutions were able to draw on their experience in wet fire installations to meet and exceed client expectations every step of the way.

  • Fire Sprinkler System
  • Fire Hydrant & Hose Reel System
  • Fire Pumps
  • Fire Extinguishers

// Empire West Apartments Perry Lakes WA

Services: Fire Sprinkler System

// St John Ambulance Metro Hub Facility Belmont WA

High hazard Fire Sprinkler System

Twin high hazard diesel fire pumps

// Proximity Apartments Rivervale WA

Services: Fire Sprinkler System